Separate installation authority from procurement
If the project requires approved installation, warranty handling or certified service, confirm the appropriate authorized installer or dealer path before ordering parts.
Plan the Garmin installation path before requesting parts, quote or installer support
Some Garmin searches are really installation searches. This guide helps buyers separate authorized installation, warranty or certified service needs from quote preparation, accessories, part-number sourcing and procurement planning.
Content updated:
If the project requires approved installation, warranty handling or certified service, confirm the appropriate authorized installer or dealer path before ordering parts.
A useful Garmin installation discussion starts with aircraft type, existing panel, desired Garmin families, accessories, documents and timeline.
Before committing to a project, a procurement supplier can help collect part-number, availability, accessory and lead-time questions that make the installer discussion easier.

Use this decision aid with the existing guide. Confirm the exact aircraft, configuration and current manufacturer data before ordering.
| Decision | First consideration | Second consideration | Before ordering |
|---|---|---|---|
| Inputs | Aircraft identity and current equipment list. | Panel photo, drawings and desired capability. | Identify the responsible technical/installation contact. |
| Interfaces and hardware | Power, antennas, racks, connectors and harnesses. | Connected displays, audio, transponder and autopilot. | List included and excluded items in the offer. |
| Schedule | Required equipment date and installation slot. | Documents, database access and remaining approvals. | Separate supply lead time from installed-system completion. |
Illustrative example — not a real customer case
An illustrative customer asks for equipment on Friday and assumes the aircraft will be ready immediately afterward.
The comparison now has an explicit scope. This illustrative case does not approve a model, quote a price or promise a completion date.
Use this guide to prepare a request. Exact suitability, installation eligibility, applicable documentation and service scope are confirmed for the specific equipment and application.
Published by Nisso Dekalo Ltd.
Published by Nisso Dekalo Ltd., using the cited manufacturer and regulator publications and our equipment-enquiry process. Our laboratory and offices support local enquiries; aircraft and helicopter installation and maintenance work is carried out at Avir-Rom (1993). The worked examples and original diagrams are illustrations. Exact suitability and work scope are reviewed for the particular equipment and application.
Our local laboratory, installation and maintenance supportMake a better decision
Local supply coordination and aircraft installation are connected activities with distinct responsibilities. Confirm the actual workshop, approval scope and document requirements for your project.
| Situation / option | Compare | Next step |
|---|---|---|
| Technical definition | Aircraft owner/operator and installation organisation define intended capability and aircraft-specific eligibility. | Identify one technical contact and a controlled equipment list. |
| Supply offer | Supplier clarifies exact P/Ns, kits, documents, availability basis and commercial terms. | Separate supply lead time from the booked installation slot. |
| Work and handover | The responsible organisation performs work within its actual scope and defines the applicable checks and handover documentation. | Agree who supplies records, configuration information, user familiarisation and update access. |
Send the project snapshot and required dates.
Confirm the installation route and compare the itemised offer.
Approve the agreed scope before supply or work and coordinate aircraft access.
Check the agreed equipment, records, support contact and remaining responsibilities.
Replace the bracketed fields with your actual details. Keep unknown information marked unknown. This is a request template, not an order.
Aircraft / current panel / intended change: DEMO aircraft; current panel and equipment list attached Responsible installer and applicable project scope: Technical/installation contact to confirm actual project scope Supply items, work items and exclusions: Separate supplied equipment, installation work and exclusions Required date, installation slot and handover documents: Agree arrival, work slot, completion checks and handover records
Nisso Dekalo Ltd handles Garmin Aviation enquiries in Israel. For a quote, send your aircraft model and the full Garmin part number or model name.
Select Aviation and search near Herzliya, Israel, to find Nisso Dekalo Ltd in Garmin’s dealer locator. For a visit, use the current address shown under Supplier contact.
Verify on GarminLongstanding aviation parts and avionics procurement experience for pilots, aircraft owners, operators and maintenance teams.
Requests are checked against the aircraft, installed avionics, exact Garmin model, accessories, documentation and required date.
Send the aircraft make/model, current avionics, exact Garmin model or part number, required accessories and target date. Compatibility and approved installation data are confirmed for the specific aircraft before ordering.
Adapter Cable (MCX to BNC)
010-10121-00
Garmin 010-00769-60 GDU 6xx Installer Unlock Card
010-00769-60
Garmin 010-00878-04 GTN 16 W COM Enablement Card
010-00878-04
Garmin 010-00878-40 GTN ChartView Enablement
010-00878-40
Garmin 010-00878-42 GTN 7XX Digital Radar Enablement Card
010-00878-42
Garmin 010-00900-20 GTN International Database Card
010-00900-20
Garmin 010-00900-30 GTN Worldwide Aviation Database Card
010-00900-30
Garmin 010-01431-01 Blank 8 GB Database SD Card for GTN Xi and TXi
010-01431-01
Garmin dealer locator lists Nisso Dekalo Ltd under the Aviation category in Israel. Installation, warranty or certified-service scope should still be confirmed for the specific aircraft and project before ordering.
Yes. Collecting model, part-number, accessory and timing details can make the installation discussion more efficient.